Timetable

Our 2018 Season runs from the 24th March - 4th November with services daily. The Timetable can be found here.

Our 2018-19 Winter Services run from 27 December 2018 to 1 January 2019 and 16 to 24 February 2019. The Timetable can be found here.

Locomotive Rota - Which engines will run on which timetable path? 

The locomotive rota is created on an evening once the engines have all returned back to Grosmont Motive Power Depot and they have had their fitness to run inspections. Customer Services publish the rota usually at around 8:30am. This can be found at the bottom of the Homepage, titled 'Scheduled Locomotives'. 

Cancelled Services

Every effort is made to run to the timetable and to operate all trains with steam unless otherwise advertised. Heritage engines can be unpredictable and if a locomotive fails we will always try to provide a replacement service. Please refer to our Terms & Conditions.  

Hot Weather

During extended periods of hot weather we may be required to add a diesel engine to a steam service. The steam engines therefore do not have to work as hard, reducing the risk to lineside fires. During extreme hot weather we may also be required to replace steam services with diesel services to prevent the risk of fire.